We are constructing spaces in which amazing things happen—breakthroughs, innovations, and insights.
Project Filter Options
Education
St. Andrews Sports Complex
Construction of a new two-level structural steel frame sports complex and student union facility.
Education
The Shlenker School Phases 1 & 2
The Shelnker School Phases 1 & 2 is a 60,000 square foot phased renovation construction project.
Education
Emery Weiner School – Main Building
The Emery Weiner School Main Building project is a new 75,000 SF, three-story addition.
Education
Montrose Library
The John Cooper School Library and Administration building is a two-phase project on an active education campus.
Education
The John Cooper School Athletic Building
The John Cooper Athletic Building is a three-story facility designed to cater to the needs of its football and cheer teams.
Education
Strake Jesuit College Preparatory Campus
Projects at Strake Jesuit include Loyola Hall, the Science & Engineering Building, Athletic Complex Student Activities Center and more.
Education, Repositioning
Gallaudet University
Gallaudet University features the repositioning of College Hall, Peet Hall and STM Laboratory.
Education, Residential & Multi-Family
The Callaway House
The American Campus Communities’ Callaway House at Austin is a 586,000 SF, 17-story, cast-in-place concrete student housing project totaling 219 residential units.
"With each project, we find Harvey Cleary to be knowledgeable and professional, but more importantly, we experience a sense of partnership and collaboration. It’s this quality in a construction firm that we seek out and are confident that with every recommendation asked of us, Harvey Cleary is at the top of the list.”
Kirksey
What our Clients Say
“Their outstanding quality of service and ability to bring the project in on schedule was a credit to their professionalism and dedication to providing excellent services.”
Ziegler Cooper Architects
What our Clients Say
“Working with Harvey Cleary, we have always felt that they were the true innovators in construction. Whether it was a tiltwall building, poured concrete or structural steel, they have always been at the forefront of finding a better way of doing something.”