
McDermott Build-Out
547,000 SF first generation interior build out of an 18 floor building
127,920 SF interior build out with an aggressive construction schedule
This project is a new build-out for Cameron's surface division to consolidation the local staff in the Harvey built, 8 West Centre. The Class A+ office space included phased turn over by level with a very aggressive construction schedule. The space includes an executive floor, café, conference center and fitness center with private offices throughout. A complicated audio/visual system was integrated in to the space. The finishes include elegant veneered millwork, full-depth solid stone counters, tables and floors, fabric paneled walls, specialty ceilings, diverse carpeting and full-glass private offices. Stone medallions cut by water-jet displayed Cameron's colors and reflected their industry at corridor intersections and the main lobby.