
Project Hank - Interchange 249 - Macy's Build to Suit
A new 909,233 SF industrial tiltwall building with associated sitework and site infrastructure.
The Construction of a 32,674 SF pre-engineered metal building industrial catalyst factory within the Haldor Topsoe plants in Pasadena, Texas.
The Construction of a 32,674 SF pre-engineered metal building industrial catalyst factory within the Haldor Topsoe plants in Pasadena, Texas. The TK building is to have an open production floor and support spaces that include a grinder, liquor, Powder and vacuum room, and a small office space. Haldor Topsoe specializes in carbon reduction technologies. This includes the production of heterogeneous catalysts and the design of process plants based on catalytic processes. They focus on hard-to-abate sectors such as heavy industry (steel and iron, chemicals, cement), long-haul transportation (aviation, shipping, trucking), and clean fuels (biodiesel and ultra-low-sulfur diesel (ULSD).