TechnipFMC's 1,000,000+ SF campus includes the consolidation of Houston office space, manufacturing, testing, and storage facilities as well as an expansive parking garage.
Industrial & Manufacturing, Warehouse & Distribution
LIT Industrial Park
LIT Industrial Park is a 909,233 SF Industrial tiltwall building with approximately 900,000 SF of paving and associated sitework.
Industrial & Manufacturing, Warehouse & Distribution
Haldor Topsoe
A state-of-the-art industrial factory that features an open production floor, support spaces, including a grinder room, liquor room, powder room, vacuum room, and dedicated office space.
Commercial Building, Industrial & Manufacturing, Interiors, Life Sciences & Labs
Confidential Plastics Manufacturing Facility
This project is a 28-acre plastics manufacturing facility featuring five buildings: an administration building, a warehouse, a laboratory building, a maintenance building and a firehouse.
Industrial & Manufacturing
FlexSteel
FlexSteel is a 256,000 SF pipe manufacturing facility with features such as 65–foot hook heights on 150–ton bridge cranes, 30–ton bridge cranes and 10–ton bridge cranes.
Industrial & Manufacturing, Warehouse & Distribution
Callis Road Industrial Park
Callis Road Industrial is a 35-acre site with three 100,000 SF buildings and a 75,000 SF building in Nashville, TN.
Industrial & Manufacturing, Warehouse & Distribution
Bluebonnet Nutrition
This 128,000 SF industrial warehouse and office project is a two-story, tiltwall and pre-engineered steel structure.
"With each project, we find Harvey Cleary to be knowledgeable and professional, but more importantly, we experience a sense of partnership and collaboration. It’s this quality in a construction firm that we seek out and are confident that with every recommendation asked of us, Harvey Cleary is at the top of the list.”
Kirksey
What our Clients Say
“Their outstanding quality of service and ability to bring the project in on schedule was a credit to their professionalism and dedication to providing excellent services.”
Ziegler Cooper Architects
What our Clients Say
“Working with Harvey Cleary, we have always felt that they were the true innovators in construction. Whether it was a tiltwall building, poured concrete or structural steel, they have always been at the forefront of finding a better way of doing something.”