Eastbound
The project is situated on a 3.45-acre site, consisting of two four-story office buildings, a future restaurant buildout on level 1 of Building A, and a six-story precast parking garage.
17,000 SF interior build-out for the architectural firm
This project was a 17,000 SF interior build-out for the architectural firm, STG Design. Their new office, located on the third floor of the GSD&M Building, utilized modern features through the use of innovative and complex new materials including a Hunter Douglas ceiling tile called Techstyle E, Gold Ray's back-painted glass, and Gold Ray's magnetic back-painted glass. These unique finishes helped showcase both STG's ability to create an eye-catching design and Harvey-Cleary's ability to work with new and ever-evolving construction materials