
Eastbound
The project is situated on a 3.45-acre site, consisting of two four-story office buildings, a future restaurant buildout on level 1 of Building A, and a six-story precast parking garage.
Eastlake at Tillery is two 3-story office buildings and a 6.5-story parking garage off E. Cesar Chavez and Tillery Street.
Eastlake at Tillery is two 3-story office buildings and a 6.5-story parking garage off E. Cesar Chavez and Tillery Street. Both office buildings have a cast-in-place concrete structure with an exterior that includes a combination of metal panels, brick, curtainwall, and window wall systems. The parking garage is pre-cast with corrugated metal panel screening and greenwalls.