Skip to Content

Confidential Plastics Manufacturing Facility

Project Location:
Gregory, TX
Market Sector:
Research, Light Industrial
Office Location:
Houston
Architect:
Gensler

This project consists of site work and five buildings. The 104,914 SF, three-story tiltwall administration building includes two control rooms, two training control rooms, a town hall, locker room facilities, open office space, offices with demountable walls, an executive office suite, emergency operations center and prayer room. The 44,189 SF, two-story tiltwall and metal building maintenance building includes the plant clinic and emergency response center, an audio booth, town center and locker rooms. The 43,352 SF, single-story metal warehouse building includes an auto retriever, dehumidified storage, high pile storage and loading dock. The 11,928 SF single-story, metal building firehouse has room for four fire trucks. The project also includes a 20,995 SF single-story, tiltwall laboratory building.

More Photos

  • more images
  • more images
  • more images
  • more images
  • more images
  • more images
  • more images
  • more images