
Project Hank - Interchange 249 - Macy's Build to Suit
A new 909,233 SF industrial tiltwall building with associated sitework and site infrastructure.
Three new tiltwall Class-A Industrial Buildings totaling 512,066 SF.
Three new tiltwall Class-A Industrial Buildings totaling 512,066 SF. The 70 acre site is off of I10 and Emerald Pass. The buildings have 36’ clear height, rear loading buildings, High-Bay LED Lighting, and a ESFR Sprinkler System. There are 151 trailer spaces, 180’-200’ Truck Court Depth, and 334 employee parking spaces.